Carbon capture readiness
The Energy White Paper, Powering our Net Zero Future (CP 337), published in December 2020 by HM Government, suggests that carbon capture readiness is: ‘…a requirement imposed on thermal plants (such as coal and gas plants) to enable future capturing and storing of carbon following a plant upgrade. Such plants currently emit CO2 directly into the atmosphere.’
[edit] Related articles on Designing Buildings Wiki
- A zero-carbon UK by 2050?
- Carbon.
- Carbon capture and storage.
- Carbon capture utilisation and storage.
- Energy balancing.
- Energy supply.
- Energy white paper.
- Generation nuclear.
- Net zero and green jobs.
- Net zero carbon 2050.
- Organisations prompt government to Build Back Green.
- Power generation.
- Renewable energy.
- The Government's 10-point plan: what's missing?
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.